2.Single time type and Promotional Plastic emergency black rain proof coat
Item No.: | MJ-black |
Fabric: | 100% PE |
Lining | 100% PE |
Description | Single time type |
Reflective tape: | ithout |
Size: | One size fit all |
Color: | Black |
Closure: | pullover |
Logo: | Screen printing ,heat-transfer printing,Embroider |
Packing: | 1PC/OPP bag,200pcs/carton |
Delivery time: | 15-25days after receiving the deposit
|
Packaging & Shipping
Packaging Dimension&Detail
MOQ | 3000-5000 Pieces | Port | NINGBO/SHANGHAI |
Capacity | 300000 Pieces/Month | Payment | L/C D/P T/T Western Union |
Package | 1pc /opp bag,100pcs/Carton |
Delivery days | 15-35 days after receiving the deposit |
Our Package
Company Information
Factory show
1.about us
YiWu Bianerli Plastic Products co.,Ltd was built in 2004.Who specializes in the production and the sale of all kind of raincoat and outdoor equipment, such as raincoat,rain poncho,rain jackets and so on.It has more than100 workers.
We adhere to a philosophy of “Professional Integrity and Innovative Business, to Provide Clients with High Quality, First-Class Service”. As the quality of our products has been trusted and loved by clients, our products are sold well in Europe, North America, South America,the Middle East and other international markets.
2.Why Choose Us?
(1)Our Factory
(2)Our Show Room
(3)Our Certifications
(4)Our Exhibition
FAQ
What we do: |
1. Vendor Assessment. Each Vendor is assessed according to their QC system. At a minimum, each vendor must identify their products by batching and testing according to the standards they claim. |
2. Vendors of primary raw materials must identify each bolt of fabric and roll of tape with batch numbers. |
3. Vendors of our primary raw materials must possess test equipment which is regularly calibrated . |
4. Vendors of our primary raw materials must carry out regular batch testing of their products. |
5. Vendors of our primary raw materials must maintain records for at least 3 years. |
6. Each production carries a Lot Number / Batch Number system which tracks our production linking incoming raw materials, customer’s order, machinists in our factory and QA staff in our factory. |
7. QC procedure. All stages of the production process are subject to QC controls and recorded accordingly. |
|
|